Phone Number

012 61 97 15, 093 41 88 99,
081 90 48 49

Email Address

info@sogecambodia.com

Water Irrigation

  • Home|
  • Water Irrigation

Clean Energy Revolution


Technical Hurdles: Describe specific technical challenges encountered, such as integrating solar systems with existing infrastructure, customizing solutions to fit unique architectural features, or dealing with extreme weather conditions affecting the installation process. For instance, The project demanded a custom-designed solar array to integrate seamlessly. Logistical Constraints: Discuss any logistical issues faced during the project, such as difficult terrain for transportation or installation, limited access to the site, or tight deadlines. For example, "Navigating the remote and rugged terrain posed significant logistical challenges